You can only do this by rescheduling it if you manually scheduled the inspection.
Remove the scheduled inspection from the tour and then re-add it with the correct InspectionWhy. If the manually-scheduled inspection is currently in the schedule, add it to a tour and then remove it from the tour before rescheduling with the desired InspectionWhy.