Changing the InspectionWhy of a Scheduled Inspection

You can only do this by rescheduling it if you manually scheduled the inspection.

Remove the scheduled inspection from the tour and then re-add it with the correct Inspectionwhy. If the manually-scheduled inspection is currently in the queue, add it to a tour and then remove it from the tour before rescheduling with the desired InspectionWhy.