Calibration Process

Notes:

  • Chateau Mobile does not verify the Confirmation or Drift passed. The technician is responsible for verifying the results and should cancel the record if it failed.

  • A Daily Calibration record is required to perform a drift in Chateau Mobile.

  • Cylinders can be added during the recording of the Daily Calibration record.

 

Daily Calibration Process:

  1. Calibrate the analyzers using their normal daily process.

  2. Connect to the analyzer using Chateau Mobile, open the Main Menu and tap Calibration / Daily Calibration Record.

  3. Select the date, time, and probe type.

  4. Add any new cylinders if required or select existing cylinders used in the calibration process.

  5. Perform the Confirmation process and record the PPM directly from the analyzer in Chateau Mobile, or if you have already performed the Confirmation, manually input the Confirmation PPM value for each cylinder.

  6. Tap Save.

 

Drift Process:

  1. Connect Chateau Mobile to the analyzer that already has a Daily Calibration recorded in Chateau Mobile.

  2. Open the Main Menu and tap Calibrate / Drifts. The cylinders used in the Daily Calibration will be automatically populated.

  3. Select the date, time, drift type (Noon or EOD), drift method (Standard or VVa), and drift to… (Confirmation PPM or Cylinder PPM).

  4. Perform the drift process for each cylinder and record the PPM directly from the analyzer in Chateau Mobile, or if you have already performed the drift, manually input the Drift PPM for each cylinder.

  5. Tap Save.