Note: The row numbers below correspond to those listed on the General and Specific Component Grid Skills checklist, available here.
|   | 
Skill | 
Procedure | 
| 1. | 
Display Tag details | 
- Select the Tag by clicking in the box or double-clicking on the Tag’s line.
 
  
- Select View Component.
 
 
 | 
| 2. | 
Display Tag Details for Multiple Components | 
- Select multiple Components.
 
  
- Select View Components.
 
 
 | 
| 3. | 
Edit a Component | 
- Select the Component.
 
  
- Select Edit Component.
 
 
 | 
| 4. | 
 Edit Multiple Components 
 | 
- Select multiple Components.
 
  
- Select Multi-Edit Components.
 
  
- You can typically select over 6,000 components for Multi-Edit before it is overwhelmed. If the number of components you desire to edit is much larger than 6,000 it is better to filter them into smaller segments.
 
 
 | 
| 5. | 
Search for Value in Location Description | 
- Create grid.
 
  
- Display the grid.
 
  
- In the Location Description column, select the hamburger menu.
 
  
- Select the funnel icon.
 
  
- Type the text in the search box.
 
  
- This will reveal each Tag with that text.
 
  
- To remove the filer, check the Select All box.
 
 
 | 
| 6. | 
View more than one Component grid at the same time 
 
 | 
You can view more than one Component grid at the same time by clicking the +New Grid button in the upper-right corner of the Component grid. 
  
This will enable you to conveniently move from tab to tab for viewing additional versions of the Component grid. 
 
 | 
| 7. | 
 | 
- Select the component(s).
 
  
- Click Add to Tour, then select Build New Tour or Add to an Existing Tour.
 
  
- If you are adding to an existing tour, select the tour you wish to add to.
 
  
- 
If you are building a new tour, enter a name for the tour.
 
  
 
 
- 
(Optional) Toggle to make the tour Evergreen.
 
  
 
 
- 
Select the Inspection Type first (AVO, Cooling Tower, M21, OGI).
 
  
 
 
- 
Select the Inspection Why from the picklist below.
 
  
 
 
- 
(Optional) assign the tour to a tech.
 
  
 
 
- 
Change the due date if you want a different value than the default.
 
  
 
 
- 
Click Add to Tour or Build Tour when finished. 
 
 
 
 |