-
Open the component grid and pull up the tags.
-
Open the Tag View for each tag.
-
Click Leaks at the top and then Closed Leaks.
-
Open the desired closed leak.
-
Click the pen next to the Leak Closed Date.
-
Change the Leak Closed Date to the desired date.
Chateau
Was this article helpful? If not, please submit feedback below.
Previous