If you prefer to import multiple inspections at once rather than entering them individually, you can use our mass import template to document the inspection information. Once completed, email the file to support@ldartools.com for processing. Please note that all fields in the template are mandatory
Important Note: There may be a charge for the import service.
Field Requirements
Field | Description |
Date and Time of Inspection | Each inspection must include both a date and a time. While the time stamp can be the same for all records, it must be present for every entry. |
Unit | Specify the LUnit where the component is located. |
Tag | Indicate the component on which the inspection is being logged. |
Analyzer | An analyzer must be included for every record, even for AVO inspections. |
Inspection Type |
For AVO or OGI inspections:
For M21 inspections:
|
Result | This field is mandatory for AVO or OGI inspections and must be logged as either Pass or Fail. |