Leak Audits

Published: 2022-05-10      Revised: 2026-11-13

NameDescriptionType
Chronic Leaks – 5000 PPM (Two >=5000 PPM Leaks on non-control Valve in 12 Months)Alerts when a non-control valve has had two or more leaks of over 5000 PPM within 12 months.Event
Chronic Leaks on NonControl Valves (3 or More Leaks in 24 Month Period)Identifies components with three leaks within a 24-month period.Event
Late Leak ResponsesAny leaks with a First Attempt, First ReTest or Final Response past due.Event
Leak Response Due in 3 DaysAny leak with a First Attempt, First ReTest or Final Response due in 3 days or less.Clearing State
Leaks Closed without PASSing PPMLeaks closed with a Close Reason other than Pass.Event
Quick RepairsInspections with a PPM between the Quick Repair threshold and the lowest leak definition for that component. See Quick Repair / Action Level for more details.State
Quick Repair Response Due in 2 DaysQuick Repairs that have not had an attempt recorded and are due in 2 days or less. See Quick Repair / Action Level for more details.Clearing Event
Zero Leaks with >= 75% of M21 Inspections completedLUnits with 0 leaks when 75% or more of the components on a given Method 21 frequency have had a Method 21 inspection in the current period. AVO inspections do not count toward the percentage. See How the Zero Leaks audit is calculated below.State

See Types of Audits for what the Type column means.

How the Zero Leaks audit is calculated​

The Zero Leaks with >= 75% of M21 Inspections completed audit flags LUnits that are well into their Method 21 monitoring for the current period but haven't found a single leak. It helps you spot units that may need a closer look at inspection quality.

What gets counted​

Chateau looks at each LUnit and M21 frequency separately. An LUnit with both quarterly and annual components gets one row for each frequency, and each row is checked on its own.

  • Components counted: the components in the LUnit with that M21 frequency. Exempt (EX) components and components not yet approved on the New Component Porch are left out. Deactivated components have no frequency, so they aren't counted either.
  • MMQ components: counted as monthly (M) while they are in the M1 or M2 phase, and as quarterly (Q) once they reach the mmQ phase.
  • Current period: the current calendar period for that frequency, such as this month for monthly or this calendar year for annual. Each component's facility time zone is used.
  • % Inspected: the number of those components that have at least one Method 21 inspection in the current period, divided by the total number of components on that frequency in the LUnit. A component inspected twice counts once. AVO and OGI inspections do not count toward the percentage.
  • Num Leaks: leaks found by any inspection type (M21, AVO or OGI) on that LUnit and frequency in the current period.

A row appears on the porch when % Inspected is 75 or higher and Num Leaks is 0.

Worked example​

Say the LUnit Unit 5 has 200 components with an annual (Y) M21 frequency. It's November, so the current period is this calendar year.

What happened this year% InspectedNum LeaksOn the porch?
160 components had an M21 inspection, and nothing leaked.160 ÷ 200 = 80.00Yes, because 80% is at least 75% and there are no leaks.
140 components had an M21 inspection, and nothing leaked.140 ÷ 200 = 70.00No, because 70% is below 75%.
160 components had an M21 inspection, but an AVO inspection on one of them found a leak.80.01No, because leaks from any inspection type count.
140 components had an M21 inspection, and 30 more had only an AVO inspection. Nothing leaked.140 ÷ 200 = 70.00No, because AVO inspections don't count toward the percentage.

If Unit 5 also had 40 quarterly (Q) components, they would be checked separately against this quarter's M21 inspections, with 40 as the total.

Columns on the porch​

ColumnWhat it shows
LUnitThe location unit.
FrequencyThe M21 frequency for this row, such as M, Q or Y.
% InspectedThe percentage of the components on that frequency with at least one M21 inspection in the current period.
Num LeaksLeaks found in the current period by any inspection type. Always 0 on this porch.
M21 CountThe number of components with at least one M21 inspection in the current period (the top of the % Inspected calculation).
Comp TypesThe component types on that frequency in the LUnit.
First Insp. DateThe earliest M21 inspection counted in the current period.
Most Recent Insp. DateThe latest M21 inspection counted in the current period.

To check a row yourself, query the Components grid for that LUnit and M21 Frequency, then compare the count against Last M21 Performed dates in the current period.

When it refreshes​

The audit runs with the daily audits each morning, and you can also run it on demand (see Audit Settings). It is a State audit, so a row stays on the porch until someone clears it, even if a leak is found later in the period.