Leak Audits
Published: 2022-05-10 Revised: 2026-11-13
| Name | Description | Type |
|---|---|---|
| Chronic Leaks – 5000 PPM (Two >=5000 PPM Leaks on non-control Valve in 12 Months) | Alerts when a non-control valve has had two or more leaks of over 5000 PPM within 12 months. | Event |
| Chronic Leaks on NonControl Valves (3 or More Leaks in 24 Month Period) | Identifies components with three leaks within a 24-month period. | Event |
| Late Leak Responses | Any leaks with a First Attempt, First ReTest or Final Response past due. | Event |
| Leak Response Due in 3 Days | Any leak with a First Attempt, First ReTest or Final Response due in 3 days or less. | Clearing State |
| Leaks Closed without PASSing PPM | Leaks closed with a Close Reason other than Pass. | Event |
| Quick Repairs | Inspections with a PPM between the Quick Repair threshold and the lowest leak definition for that component. See Quick Repair / Action Level for more details. | State |
| Quick Repair Response Due in 2 Days | Quick Repairs that have not had an attempt recorded and are due in 2 days or less. See Quick Repair / Action Level for more details. | Clearing Event |
| Zero Leaks with >= 75% of M21 Inspections completed | LUnits with 0 leaks when 75% or more of the components on a given Method 21 frequency have had a Method 21 inspection in the current period. AVO inspections do not count toward the percentage. See How the Zero Leaks audit is calculated below. | State |
See Types of Audits for what the Type column means.
How the Zero Leaks audit is calculated
The Zero Leaks with >= 75% of M21 Inspections completed audit flags LUnits that are well into their Method 21 monitoring for the current period but haven't found a single leak. It helps you spot units that may need a closer look at inspection quality.
What gets counted
Chateau looks at each LUnit and M21 frequency separately. An LUnit with both quarterly and annual components gets one row for each frequency, and each row is checked on its own.
- Components counted: the components in the LUnit with that M21 frequency. Exempt (EX) components and components not yet approved on the New Component Porch are left out. Deactivated components have no frequency, so they aren't counted either.
- MMQ components: counted as monthly (M) while they are in the M1 or M2 phase, and as quarterly (Q) once they reach the mmQ phase.
- Current period: the current calendar period for that frequency, such as this month for monthly or this calendar year for annual. Each component's facility time zone is used.
- % Inspected: the number of those components that have at least one Method 21 inspection in the current period, divided by the total number of components on that frequency in the LUnit. A component inspected twice counts once. AVO and OGI inspections do not count toward the percentage.
- Num Leaks: leaks found by any inspection type (M21, AVO or OGI) on that LUnit and frequency in the current period.
A row appears on the porch when % Inspected is 75 or higher and Num Leaks is 0.
Worked example
Say the LUnit Unit 5 has 200 components with an annual (Y) M21 frequency. It's November, so the current period is this calendar year.
| What happened this year | % Inspected | Num Leaks | On the porch? |
|---|---|---|---|
| 160 components had an M21 inspection, and nothing leaked. | 160 ÷ 200 = 80.0 | 0 | Yes, because 80% is at least 75% and there are no leaks. |
| 140 components had an M21 inspection, and nothing leaked. | 140 ÷ 200 = 70.0 | 0 | No, because 70% is below 75%. |
| 160 components had an M21 inspection, but an AVO inspection on one of them found a leak. | 80.0 | 1 | No, because leaks from any inspection type count. |
| 140 components had an M21 inspection, and 30 more had only an AVO inspection. Nothing leaked. | 140 ÷ 200 = 70.0 | 0 | No, because AVO inspections don't count toward the percentage. |
If Unit 5 also had 40 quarterly (Q) components, they would be checked separately against this quarter's M21 inspections, with 40 as the total.
Columns on the porch
| Column | What it shows |
|---|---|
| LUnit | The location unit. |
| Frequency | The M21 frequency for this row, such as M, Q or Y. |
| % Inspected | The percentage of the components on that frequency with at least one M21 inspection in the current period. |
| Num Leaks | Leaks found in the current period by any inspection type. Always 0 on this porch. |
| M21 Count | The number of components with at least one M21 inspection in the current period (the top of the % Inspected calculation). |
| Comp Types | The component types on that frequency in the LUnit. |
| First Insp. Date | The earliest M21 inspection counted in the current period. |
| Most Recent Insp. Date | The latest M21 inspection counted in the current period. |
To check a row yourself, query the Components grid for that LUnit and M21 Frequency, then compare the count against Last M21 Performed dates in the current period.
When it refreshes
The audit runs with the daily audits each morning, and you can also run it on demand (see Audit Settings). It is a State audit, so a row stays on the porch until someone clears it, even if a leak is found later in the period.