Skip to main content

LSTAR

Published: 2026-11-03 Revised: 2026-11-03

LSTAR is a daily score, out of 100 points, for each technician. It measures how well a technician's workday lined up with the schedule your site has set: when they started monitoring, how long their breaks and lunch ran, when they finished, and whether they reached their component target for the day. Alongside the score, Chateau calculates Time on Tools, the share of the payroll day the technician spent actively inspecting.

Your site decides the targets and how many points each one is worth in Settings > Quality Signals. This article explains where the score comes from, from the technician's day in the field to the number you see in Chateau.

You can review LSTAR in three places:

  • The LSTAR Technician Performance report (Reports > Other), one day at a time.
  • The Technician Scorecard and Tech Detail panel on the Dashboard.
  • The LSTAR & Time on Tools tab of Insights (Beta), for trends over a month, quarter, or year.

Technicians do not see their LSTAR score in Chateau Mobile.

In the field​

Technicians do not do anything extra for LSTAR. Chateau builds the score from the times recorded on the inspections they perform, plus the Work Performed they choose when they check in.

Which inspections count

Only M21 and AVO inspections count toward LSTAR. OGI inspections, Cooling Tower inspections, and repair attempts are not included, and recording a component as Unable to Monitor does not count as an inspection. A technician who spent the whole day on OGI has no LSTAR score for that day.

When an inspection starts and ends

  • An M21 inspection taken with a connected analyzer starts when monitoring begins and ends when the reading is finished, including any time the technician held the probe for a deflection check.
  • An M21 reading entered by hand counts as a single moment: the time the reading was entered.
  • An AVO inspection counts as a single moment: the time it was saved.

These times come from the handheld's clock, so make sure each handheld is set to the correct date and time.

Whose day it is

Each inspection belongs to the technician selected in Chateau Mobile when it was recorded. If a technician inspects while someone else's name is selected, those inspections score toward the other person's day.

Work Performed at check-in

LSTAR uses the technician's Work Performed choice to decide which daily component target applies (see Daily component target below). This requires the Prompt technicians for work performed at check-in setting under Settings > Miscellaneous. See Work Performed for how to turn it on.

The choice counts toward the date the technician checks in. A technician who checks in the next morning will have the choice recorded on the wrong day, and the day they actually worked will be scored against the standard target. Have technicians check in at the end of each workday.

LSTAR recognizes these Work Performed values by name, so they are read-only in the Work Performed picklist:

  • Inspections- DTMs Only
  • Inspections- ReTests Only
  • Inspections- Pumps Only
  • Inspections- Mixed
  • Inspections- Partial Day

LSTAR looks for the words DTMs Only, ReTests Only, Pumps Only, Mixed, or Partial Day anywhere in the name, so any other value containing them is scored the same way. For example, Data Project- Mixed is scored like Inspections- Mixed. LSTAR treats every other value the same as no choice at all.

When the score appears

Inspections reach Chateau when the technician checks in. Until then, that day has no LSTAR score, or only a partial one if the technician checked in earlier in the day and kept working.

How a day is scored​

A day is one calendar day for one technician, in your facility's time zone. A technician gets a score for every day they recorded at least one M21 or AVO inspection, including weekends and holidays.

Chateau checks six standards. Each standard is all or nothing: if the technician meets it, they get all of its points; if not, they get none. With the default weights:

StandardMet whenDefault targetDefault points
First componentThe day's first inspection started at or before the target time7:30 AM30
AM breakThe morning break was no longer than the limit26 minutes10
LunchLunch was no longer than the limit95 minutes30
PM breakThe afternoon break was no longer than the limit26 minutes10
Last componentThe day's last inspection ended at or after the target time3:45 PM10
Daily component targetThe technician inspected at least the day's target number of componentsDepends on Work Performed10

You can change every target and point value in Settings > Quality Signals. See Quality Signals. The AM and PM breaks share one limit, Break not to exceed. The points must always add up to 100, so a technician who meets all six standards always scores 100.

Breaks and lunch

Chateau does not ask technicians when they took a break. It finds breaks by looking at the gaps between inspections, from the end of one inspection to the start of the next:

  1. A gap shorter than the Gap counts as a break when ≥ setting (15 minutes by default) is treated as travel between components and is ignored.
  2. A gap of 60 minutes or more that ends between 11:00 AM and 2:00 PM is lunch.
  3. Any other gap is a break: an AM break if work resumed before noon, a PM break if work resumed at noon or later.
  4. If there is more than one gap of a kind, the longest one is the one judged against the limit.

The 60-minute lunch length, the 11:00 AM to 2:00 PM lunch window, and the noon split are fixed and cannot be changed in Settings.

Some results to expect:

  • A 45-minute lunch that ends at 12:15 PM is shorter than 60 minutes, so it is counted as a PM break. It is longer than the 26-minute break limit, so the technician misses the PM break standard.
  • A 70-minute lunch that ends at 2:20 PM ends outside the lunch window, so it is counted as a PM break and also misses the PM break standard.
  • A technician who works straight through with no break or no lunch meets that standard. No gap means nothing went over the limit.

Gaps beyond the three that are judged are counted as Excess Gaps. They do not change the LSTAR score, but they do reduce Time on Tools.

Daily component target

Chateau counts the different components the technician inspected that day. A component inspected twice counts once. The target depends on the Work Performed the technician chose for that day:

Work Performed chosenTarget usedDefault
Inspections- DTMs OnlyDTMs Only105
Inspections- ReTests OnlyRetests Only55
Inspections- Pumps OnlyPumps Only80
Inspections- Mixed or Inspections- Partial DayValve + Nonconnectors350
Anything else, or nothing chosen, and no connectors inspectedValve + Nonconnectors350
Anything else, or nothing chosen, and at least one connector inspectedConnectors450

If a technician chose more than one Work Performed on the same day (for example, they checked in twice), the value highest in this table is the one used.

Connectors are all or nothing: inspecting even one connector on a day without one of the named Work Performed values moves the technician to the Connectors target.

The targets are the Min/Day values on the Pace Targets tab of Quality Signals.

Retest technicians

If your retest crews start their day later than other technicians, turn on Retest technicians start later on the Workday Schedule tab of Quality Signals and set their later start time. On days the technician chose Inspections- ReTests Only, the first component standard uses the later time. The other five standards do not change.

Hero Days

A Hero Day is a day the technician met all six standards, which is a perfect 100. A Hero streak is the number of Hero Days in a row, counted in workdays: a day with no inspections, such as a weekend, does not break a streak.

Time on Tools​

Time on Tools is the time from the start of the technician's first inspection to the end of their last one, minus every gap that counts as a break. That includes the AM break, PM break, lunch, and any Excess Gaps. Short gaps between components (under the Gap counts as a break when ≥ setting) stay in, because they are part of working a route.

Chateau shows Time on Tools in hours and as a percentage of the payroll day. The payroll day is the Payroll Start to Payroll End span on the Workday Schedule tab of Quality Signals (7:00 AM to 5:00 PM by default).

Time on Tools is calculated from inspection times only. It does not use GPS tracking.

Setting up LSTAR​

  1. In Settings > Miscellaneous, turn on Prompt technicians for work performed at check-in.
  2. In Settings > Quality Signals, review the Workday Schedule, Pace Targets, and Breaks & Effort tabs. Set the targets to what your site actually expects; the defaults are a starting point.
  3. Tell your technicians which Work Performed to choose for each kind of day, and to check in at the end of each workday.

Common questions​

  • "A technician took a short lunch and lost points for a PM break." A gap under 60 minutes is never lunch. See Breaks and lunch above.
  • "A technician's day shows the 350 target even though they chose DTMs Only." The Work Performed choice is recorded on the day of check-in. If they checked in after midnight, the choice landed on the next day.
  • "A technician's day shows the Connectors target." At least one connector was inspected that day and no named Work Performed was chosen.
  • "A technician has no score for a day they worked." They either performed only OGI or Cooling Tower inspections, or they have not checked in yet.
  • "A technician's first component time is earlier than they arrived." Check the handheld's clock, and check whether someone else inspected under that technician's name.