5,000 PPM without 2 Advanced Attempts by Day 25

Group

DOR

Type (State, Event, or ClearingState)

ClearingState

Static Columns

  1. LUnit
  2. Tag
  3. Type
  4. Subtype
  5. Profile
  6. Isolatable

Live Columns

  1. Days Since Leak
  2. Last Inspection
  3. PPM
  4. AttemptDate1
  5. AttemptHow1
  6. AttemptDate2
  7. AttemptHow2
  8. AttemptDate3
  9. AttemptHow3
  10. IsDor

Trigger Criteria

  • Component is a Valve, but not a Control Valve
  • Component is on DOR
  • Last inspection PPM is 5,000 or greater
  • There is less than 2 of either Drill and Tap or Secondary Seal Injections Repair Attempts by Day 25 after Leak Open Date