5,000 PPM DOR with No Drill and Tap

Group

DOR

Type (State, Event, or ClearingState)

ClearingState

Static Columns

  1. LUnit
  2. Tag
  3. Type
  4. Subtype
  5. Profile
  6. Isolatable
  7. Inspection Date
  8. Inspection PPM

Live Columns

  1. Days Since Leak
  2. Last Inspection
  3. PPM
  4. AttemptDate1
  5. AttemptHow1
  6. AttemptDate2
  7. AttemptHow2
  8. AttemptDate3
  9. AttemptHow3
  10. IsDor

Trigger Criteria

  • Component is a Valve, but not a Control Valve
  • Component is on DOR (implies that there is an open leak)
  • Last inspection PPM is 5,000 or greater
  • There is no Drill and Tap or Secondary Seal Injection Repair Attempt since the leak open date

Was this article helpful? If not, please submit feedback below.